Blog

Entries for the 'Manufacturing Automation & Intelligence' Category

PLC Troubleshooting

We are frequently asked to work on PLC systems for clients that we did not develop. The job could be troubleshooting an issue or adding a new feature to the system. Working with unfamiliar code has its own unique challenges, although we take pride in...


"Indirect Addressing" in Step 7 Basic v10.5 SP2

For those of us who appreciate and harness the power of indirect addressing in Siemens S7 300 and 400 level PLCs, we were sad to hear that this functionality was not supported in the same way for the new Step 7 Basic software for S7-1200 PLCs. As ...


Siemens S7-1200 PLC communicates through Sinaut MD720-3 cellular modem

Many consumers, including myself, have tapped into the ever-growing functionality of mobile internet. Many people leverage this infrastructure for their mobile phone. Others are beginning to use WiMAX connections for their PCs. Not to be out-done, PL...


Achieving CSIA Certification

It can be difficult to assure current and potential clients that you run your business well. Moreover, if you are honest with yourself, you know you could run your business better. It can be difficult as a controls system integrator to find business ...


New White Paper: Electric Vehicle Battery Pack Testing

DMC has been involved in quite a few battery testing projects lately. We thought it would be helpful to assemble a compilation of some of the general things we have learned into a new white paper.... "Electric Vehicle Battery Pack Testing in ...


Using Norton Ghost for "Cloning" PC Based LabVIEW Test Stations and for Disaster Recovery

While developing a Windows PC based long term test system running LabVIEW software, we found the use of Norton Ghost to be a very effective means of setting up multiple identical test stand units quickly and efficiently. Basically we took the approac...


Check out our new Case Studies!

We have added a few new Case Studies that showcase two of the business areas in which we recently have had a number of projects: Sharepoint Development and Battery Testing. Check out these Case Study entries to read more detail! Sharepoint Time...


Converting legacy Acroloop Motion to an ACR 9000 controller

DMC started as a motion integrator (the M stands for motion). Even though we do a great many other things these days, we still maintain a strong competency in this area. We were recently contacted by a client who has an old Acroloop 2000 ISA based...


Redundant Control Systems: Siemens S7 400H Series PLC and WinCC

There are certain control systems, such as in nuclear power plants and airplanes, that cannot be disabled or shut down, even momentarily, because of the threat to people’s lives. In these applications, a redundant control system must be in plac...


Using Devcon Command Line Utility to Rescue Unresponsive USB Devices

When choosing a piece of hardware, you will likely be confronted with many options from different vendors for what interface (PCI, PXI, USB, Serial/GPIB, LXI) that device will use to communicate with your software controller, so how do you choose? ...


Page 38 of 42First   Previous   33  34  35  36  37  [38]  39  40  41  42  Next   Last   
Page 38 of 42