Siemens Programming, Commissioning, Plant Start-Up, & Support for Paper & Pulp Processing Plant

Summary

DMC provided Siemens PLC and Siemens WinCC OA programming for a pulp processing plant in the paper and pulp processing industry. This included offline programming, commissioning, plant start-up, and ongoing support.

Customer Benefits

  • Customized open library objects to meet customer requirement 
  • Flexible architecture allowed process changes to be implemented quickly 
  • Able to provide remote support to keep facility running 24/7
  • Rapid development using open library objects 

Technologies

  • Siemens S7-1500 PLCs
  • Siemens G120 Drives
  • IO-Link Motor Starters 
  • Siemens Industrial Thin Clients 
  • Apple iPads
  • TIA Portal V15
  • Multi-User Server
  • WinCC OA SCADA
  • Siemens Open Library
  • Profinet
     

Solution

The customer chose DMC because of our Siemens platform expertise. DMC worked closely with the customer’s internal engineering team during development and with the client’s operators and maintenance staff during commissioning and startup. We developed functional requirements based on documentation provided by the customer. DMC also designed SCADA screens based off process P & IDs (process & instrumentation diagrams).  

This project had a very tight schedule and was a design/build project. DMC used a standard & flexible architecture to develop code rapidly and enabled fast responses to changes made in the field as they occurred. DMC is repeating the process at a second facility.

Posted in HMI and SCADA Systems, Manufacturing Automation and Intelligence, PLC Programming, Siemens S7 PLC Programming, WinCC Open Architecture Development

DMC Chicago • 2222 N. Elston Ave Suite 200 • Chicago, IL 60614 • (312) 255-8757

DMC Boston • 20 Holland St Suite 408 • Somerville, MA 02144 • (617) 758-8517

DMC Dallas • 1920 McKinney Ave 7th Floor • Dallas TX, 75201 • (972) 432-5536

DMC Denver • 1860 Blake St Suite 410 • Denver, CO 80202 • (303) 223-1801

DMC Houston • 3311 Richmond Ave Suite 209 • Houston, TX 77098 • (713) 322-9192

DMC New York • 141 W 36th St Suite 20N • New York, NY 10018 • (917) 473-0030

DMC Seattle • 506 2nd Ave Suite 910 • Seattle, WA 98104 • (206) 388-5186

DMC St. Louis • 1034 S Brentwood Blvd • St. Louis, MO 63117 • (314) 627-5427

https://www.dmcinfo.comsales@dmcinfo.com • (888) DMC-4400