Blog

Entries for the 'Test and Measurement Automation' Category

ADG Mission Critical Applications: Quality Matters

In Aerospace, Defense, and Government (ADG) projects, quality is not a luxury—it's a necessity. Failure is simply not an option in mission-critical applications. However, "quality" is a complex concept: if applied too rigidly, it ...


ADG Mission Critical Applications: Turning Your Vision Into Reality

Projects in Aerospace, Defense, and Government (ADG) sectors demand unwavering reliability—failure is not an option. At DMC, we understand that designs are only meaningful if they result in real, working systems. In the high-stakes world of mis...


ADG Mission Critical Applications: The Plan is the Plan - Until the Plan Changes

In Aerospace, Defense, and Government (ADG) environments, software systems must be engineered for unwavering reliability because failure is not an option in mission-critical applications. Yet even the most well-structured plans are destined to evolve...


ADG Mission Critical Applications: Seeing Your Vision Take Shape Through Designs

Understanding ADG Requirements: More Than Just Listening There's zero margin for error in Aerospace, Defense, and Government (ADG) projects. Mission-critical applications demand absolute reliability—failure is not an option. Clear commun...


ADG Mission-Critical Applications: Entrusting Your Mission's Objectives to a Partner

In Aerospace, Defense, and Government (ADG) projects, success isn't simply about delivery—it's about trust. These projects are high-stakes, often complex, and inherently collaborative. When you bring on a partner, you're not just ou...


Join DMC at NI Connect 2025!

Join DMC at NI Connect 2025, April 28-30 at the Fort Worth Convention Center in Fort Worth, Texas. NI Connect is a technical conference hosted by National Instruments (NI). The annual event features technical sessions, keynotes, networking opportu...


ADG Mission-Critical Applications: It All Starts with Documentation

In Aerospace, Defense, and Government (ADG) projects, reliability isn't just a goal—it's a requirement. These high-stakes missions leave no room for error. As the old adage goes, “A failure to plan is a plan to fail,” and at...


ADG Mission-Critical Applications: Building the Right Way with A.R.T.ful Design

Aerospace, Defense, and Government (ADG) projects demand unwavering reliability, as failure is not an option. From early-stage research to deployment and beyond, rigorous testing ensures mission-critical assets perform flawlessly throughout their lif...


Using a Switch Matrix for Automated Testing

Using a Switch Matrix for Automated Testing  In the world of Test & Measurement Automation, a turnkey test system may have tens, hundreds, or even thousands of individual signals or signal pairs that need to be verified during a test. Swi...


Handheld Device Integration into Automated Test Stand

DMC recently integrated a Fluke 726 handheld multifunction calibrator into a turnkey automated test system. The test system incorporated a large switching matrix connected to multiple test instrumentation hardware components to pe...


Page 1 of 21First   Previous   [1]  2  3  4  5  6  7  8  9  10  Next   Last   
Page 1 of 21